Every support team knows the ticket that bounces. Remote session, no luck, a few more steps over the phone, another update to the customer, and three days later someone finally says "we need to send an engineer". Dispatch too late and you have burned most of the SLA on troubleshooting that was never going to work. Dispatch too early and an engineer spends a day on something the customer could have fixed with a reboot.
The fix is to write down escalation criteria, so the remote-or-onsite decision is made on purpose rather than by whoever runs out of patience first.
Signs a ticket needs an onsite technician
- Remote steps are exhausted. You have worked through the agreed remote checklist for this issue type and the problem persists.
- The likely cause is physical. A failed component, a swap, cabling, power or visible damage.
- Diagnosis needs eyes on site. Indicator lights, the environment around the equipment, or something the customer cannot describe reliably.
- The work is on-site by nature. An installation, a site survey or a relocation.
- The contract says so. Some service agreements require on-site attendance for certain faults, whatever the remote options.
- Remote access is not possible. The site is offline, or the customer's security policy rules it out.
- It keeps coming back. The same fault has returned after a remote fix.
Signs it should stay remote
- You are still gathering information and do not yet know what is wrong.
- The customer can fix it with guidance, and is willing to.
- The issue is configuration or software you can reach remotely.
- You are waiting on a vendor or a replacement part, so a visit today would change nothing.
A simple escalation matrix
Illustrative. Adapt the signals to your own services and contracts.
| Signal | Keep remote | Dispatch |
|---|---|---|
| Cause identified as configuration or software | Yes | |
| Cause identified as hardware or cabling | Yes | |
| Agreed remote steps completed, fault persists | Yes | |
| Customer has not yet answered diagnostic questions | Yes | |
| Install, survey or relocation requested | Yes | |
| Part on order, not yet received | Yes, until it arrives | Then yes |
What the technician needs before leaving
A site visit fails quietly when the engineer arrives without context and has to re-ask the customer everything. Before you dispatch, make sure the job has:
- The customer account, and the person who will be on site.
- The site address and access instructions.
- A problem summary, including the remote steps already tried.
- The priority.
- Likely parts or services, and any approved quote.
- The asset or serial number.
- Photos or screenshots the customer has sent.
The last three are the ones that most often go missing. Check them on the job rather than assuming they travel with it.
The visit date is not the SLA deadline
These are two different clocks. The ticket's resolution deadline comes from its SLA policy. The visit date comes from engineer and customer availability. A visit booked for Thursday on a ticket due Wednesday is a breach you scheduled yourself. Pick the visit date deliberately, check it against the ticket's SLA deadline, and if they cannot meet, tell the customer before the deadline rather than after. How breaches then show up in reporting is a separate question, covered in why SLA reports don't match reality.
Keep the ticket and the job in step
The ticket stays the customer conversation; the job is the scheduled work. If the visit moves, the ticket's due date should move with it. Finish the visit before you close the ticket. And allow one ticket to have more than one job, for example a diagnosis visit followed by a second visit to fit parts.
Planned contract visits are different: they come from a schedule, not a ticket. See AMC maintenance scheduling.
A dispatch checklist
- Written escalation criteria for each common issue type, with the remote steps to try first.
- A named person who makes the dispatch call.
- A handover that includes asset details, access instructions and photos.
- The visit date checked against the ticket's SLA deadline before it is confirmed.
- The ticket's due date updated whenever the visit moves.
- The ticket closed only after the visit is complete.
How DexVee handles it
In the DexVee web app, a ticket is escalated with Escalate to Work Order in the Field Service panel on the ticket page (+ New WO adds another once one exists). It is a deliberate step: there is no general rule that converts tickets automatically. The person converting can change the title, priority and assignee first. The subject, description, contact, account, assignee, asset (if the ticket has one), service address and priority carry over, the work order's type is set from the ticket's type where there is a clean match (otherwise it is General), and the work order links back to the ticket. The ticket's classified service SKU becomes the first service line, and if the ticket is tied to a deal, service SKUs from the deal's latest approved or accepted proposal are added. New work orders start as Draft, and a ticket can have several, all listed in the panel.
Two things to check after converting. The work order's scheduled and due dates default to the ticket's own due date field, not the SLA deadline. And the ticket's comments are not copied: the description is, and the history stays on the linked ticket. Rescheduling the work order moves the ticket's due date to match. By default DexVee also refuses to close a ticket while a linked work order is still live; an organisation setting can switch that guard off.
For simpler visits, a "Technical visit" ticket gets a scheduled visit with check-in and check-out once it is assigned, without a work order, and the ticket cannot be closed while that visit is still open. More on the helpdesk side of DexVee, and on how SLA policies set the deadline the visit date has to respect.