One system for planned maintenance, vendor work orders and multi-site facilities
Facility management software for Indian businesses — planned preventive maintenance, vendor work orders and multi-site asset tracking, without enterprise-ERP complexity.
One system for planned maintenance, vendor work orders and multi-site facilities
www.dexvee.com
The challenge
Facility management teams — whether a standalone FM company or an in-house facilities function at a corporate campus, hospital, mall or industrial plant — are responsible for planned preventive maintenance, reactive break-fix, vendor coordination and asset upkeep, often across multiple sites. Managing this through work orders on email, vendor coordination by phone and maintenance schedules in spreadsheets is workable at small scale, but breaks down once you are running 20+ engineers and hundreds of assets across more than one location.
Vendor management is often the weakest link: a facilities team coordinating cleaning, security, lift maintenance and electrical contractors typically has no systematic way to issue work orders to vendors, track completion, or hold vendors accountable to the SLAs written into their contracts. Work gets done informally, completion is unverifiable, and disputes over billing arise because nobody has a signed-off work record that both parties saw at completion.
Asset lifecycle is the second gap: FM teams are responsible for assets — HVAC units, elevators, fire suppression systems, generators, UPS equipment — whose maintenance history and calibration records need to be traceable for statutory and insurance compliance. A team tracking this by spreadsheet and physical logbooks has a documentation gap every time an audit, insurance claim or regulatory inspection requires provable maintenance history going back 12 or 24 months.
How DexVee helps
Planned maintenance, vendor work orders and asset records in one platform
Facility management companies typically run on DexVee's FSM, CRM and Inventory modules together — planned maintenance schedules raise work orders in one click, vendor coordination has a paper trail, and assets carry their full service history.
Facility Management Companies: the parts that make up the page, drawn as a line diagram
Planned preventive maintenance scheduling
Each maintenance plan carries its own frequency — annual fire-system inspections, monthly HVAC filters, weekly pest control — with a next-due date, an overdue flag and one-click work-order creation, so planned visits are harder to miss because a coordinator forgot to raise them.
Vendor and in-house work order management
Work orders are issued to in-house engineers or external vendors through the same system, with mobile sign-off on completion — creating a verifiable record that both sides agreed the work was done.
Multi-site asset tracking
Every facility asset carries its full maintenance and inspection history — serial number, install date, last service, next scheduled visit — tied to the specific site and building location it lives in.
Multi-site dispatch and territory assignment
Work orders are assigned from the dispatch board, which shows each engineer’s open work orders and capacity and can be filtered by service territory — not worked out by a facilities coordinator on a shared phone.
Vendor billing and invoice verification
Vendor invoices are matched against issued work orders and sign-off records before payment approval, so a bill for work that wasn't completed to specification is caught before it clears.
SLA countdowns on tickets
Response and completion deadlines are tracked on tickets with a live countdown that shows a deadline coming before a client or building occupant has to escalate — keeping accountability visible rather than assumed.
What this looks like in practice
An overdue planned maintenance visit is flagged on its maintenance plan and its work order is raised in one click, so it is less likely to be missed when a coordinator is on leave or the calendar reminder goes unnoticed.
A vendor completing a work order signs off via mobile, creating a verifiable completion record — so billing disputes and "was that actually done?" conversations have a traceable, time-stamped answer.
All assets across all sites carry their full maintenance and inspection history, so a regulatory audit or insurance claim has documented, date-stamped service records to draw on rather than reconstructed logbooks.
Frequently asked questions
Yes — work orders can be assigned to in-house engineers or to a vendor organisation, with the same dispatch, mobile execution and sign-off workflow. In-house teams and vendors operate through the same system; you see one consolidated view of planned and reactive work regardless of who is executing it, and the sign-off record always names who completed the job.
Multi-site is a core part of the data model, not an add-on. Assets, work orders, maintenance schedules and vendor contracts are all scoped to a specific site, with roll-up reporting across all sites for a facilities manager who needs the total picture without per-site lookups. A corporate campus with five buildings and an industrial client with three plants are both modelled the same way.
Yes — each asset carries its full maintenance and inspection history, with engineer or vendor name, date, sign-off and parts logged per visit. This creates the traceable record that statutory inspectors and insurance surveyors request, rather than a facilities team reconstructing a year's worth of maintenance from scattered logbooks at inspection time.