From signed contract to sign-off and renewal, with the work in between on record
The contract keeps its work orders, consumption, forecast and sign-off together, and a separate renewals register tracks licences, subscriptions, warranties and certificates the same way.
The challenge
A signed contract is where the paperwork usually stops and the real work begins. Visits happen, parts are used, some work is outside scope, and at the end the customer asks what they got for the money. Answering means rebuilding the story from work orders, invoices and an engineer’s memory.
Renewals have the same gap. AMCs are only part of what expires: OEM licences, subscriptions, warranties and the authorisation certificates that let you bid. Each has a date and an owner, and a lost renewal rarely gets recorded at all, so nobody knows how many were kept.
The cost side matters at renewal. Pricing the next term without knowing how fast the last one was used up and what it cost is a guess made while the customer is already shopping around.
How DexVee helps
One contract record from first visit to renewal quote
Contracts sits under CRM and Renewals under Operations. This page covers what the three AMC pages do not: the contract’s own working tabs, the review and sign-off steps, the draft renewal quotation and the renewals register. Reminders and the 30, 60 and 90-day pipeline are on the AMC renewal tracking page, and contract margin is on the profitability page.
A contract register with the work attached
The Contracts list filters by status (Active and Expiring Soon by default, plus Draft, Expired and Cancelled), category and search, shows billing frequency from monthly to one-time or custom, the next billing date and the renewal date, and flags a contract whose billing date has arrived. Views can be saved, privately or shared. Open a contract for tabs on its work orders, goods and services consumed, financials, invoices and payments, milestones, activity, documents and generated documents. Super Admin, Admin, BDM and Bid Manager create and edit contracts, and exporting the whole list to Excel is Super Admin only.
Covered, partly covered and out-of-contract work
Each line on a work order under a contract carries a contract treatment: covered, partially covered or out of contract, with the standard price and any contract discount. The Performance Report uses it to show what the contract absorbed against what was chargeable, with utilisation, a monthly trend, the most consumed goods and services and SLA results. It carries cost and margin, so it needs commercial access (a role that can view finance or deals data), and it can be downloaded as PDF or Excel.
Review of service-only visits
A completed work order under a contract that has no goods lines is flagged for review, so a missing parts entry is not mistaken for a genuine zero-parts visit. The flag is raised when the work order completes and is caught by a check every ten minutes. An engineer approves it on the WO Review tab, with an optional note. A separate Unaccounted Spend list records real cost against a work order that has no structured part line (description, amount, notes), and it feeds the contract’s cost.
A customer-safe forecast and an in-app sign-off
Customer Forecast produces a branded PDF for the customer with the value consumed against the contract, what remains, savings against standard prices, coverage and a renewal outlook, leaving out cost and margin. Sign-Off builds a completion report (work orders by status, services and goods delivered, SLA results, open work orders and open milestones) that is ready to sign 15 days before the end date. Staff record the signer’s name and either a drawn signature or an uploaded signed copy, and the report is frozen as it stood at signing. There is no public e-sign link for the customer.
Renewal forecast and a draft renewal quotation
The Renewal Forecast tab holds editable, SKU-backed line items with tax worked out on the server, and an internal outlook: a suggested renewal probability that a user with commercial access can override between 0 and 100, and a suggested price change capped at 25%, based on utilisation, margin and how fast the contract value is being used against its term. For AMC (End User Computing) contracts that are active, expiring soon or expired, Generate Renewal Quotation creates a draft proposal pre-filled from this term’s delivery, and for an expired contract you choose the new start date. It is created on request, never automatically, and goes through the normal proposal review and send steps. Other contract categories have no quotation template yet.
A renewals register beyond contracts
Renewals holds six types: contract, subscription, licence, warranty, support and certificate. Each has a vendor, account, optional asset and catalogue SKU, licence key and seats, a cycle from monthly to every three years, cost and an optional custom reminder date. A certificate keeps the OEM-issued authorisation code, the portal and the product category. On an account’s Renewals tab, Renewed moves the date forward by the record’s own cycle, Lost and Not required close it out, and Create Opportunity opens a renewal deal. A lifecycle badge shows whether the current cycle went to you, to a competitor you recorded by hand, or is upcoming or due, and linking an invoice for the same product marks the cycle as fulfilled by you without overwriting a competitor you recorded. For vendors set to track renewals, a tab shows the retention rate (kept out of those that came due), value by state, a 30, 60 and 90-day pipeline and a per-account roll-up, with a CSV export for Super Admin.
What this looks like in practice
- A visit with no parts is confirmed by an engineer, instead of counting silently as free work.
- The customer is shown what the contract delivered without cost or margin, and completion is signed against a report frozen at that moment.
- A licence, a warranty or an OEM authorisation is tracked with the same lifecycle as an AMC, and a renewal lost to a competitor is recorded instead of disappearing.
Frequently asked questions
Super Admin, Admin, BDM, Bid Manager, System Engineer and Technical Presales can read contracts, subject to the account ownership and branch rules. The Performance Report and the renewal-probability override need commercial access, meaning the role can view finance or deals data. The customer forecast and the sign-off report are built to leave out cost and margin.
Not through a public link. Sign-off is recorded in the app by staff, with the signer’s name and either a drawn signature or an uploaded signed copy, and the report is frozen as it stood at that moment. Staff can prepare the report at any time, and it is framed as ready to sign from 15 days before the end date.
No. It is created only when someone asks for it, as a draft that goes through the normal proposal editor, approval and send steps. It is currently supported only for AMC (End User Computing) contracts, because the other categories have no matching template.
Not on a timetable today. The flag is stored on the record, and an API action can move the date forward by one cycle, but nothing in the renewals scheduler does it for you. Daily reminders, follow-up tasks and expiry marking are described on the AMC renewal tracking page.
From our Insights
AMC Renewal Playbook: What to Do at 90, 60 and 30 Days
A stage-by-stage AMC renewal process: who owns each 90/60/30/7-day checkpoint, what must exist by then, and what a CRM needs to track to run it.
How to Calculate AMC Charges
How to price an AMC: cost-plus and asset-value methods, comprehensive vs non-comprehensive cover, GST on top, and a worked example you can adapt.
Why AMC Renewals Quietly Lose Revenue
AMC and contract renewals are where recurring revenue quietly leaks. Here's why it happens and what actually prevents it.
Explore other features
Ready to see Renewals & Contracts Register in action?
Talk to our team about your specific workflow — no generic demo script, just a conversation about what you actually need.
Prefer a walkthrough? Book a demo
